New Pacquet's installation, Journal Du Vrac

NYRSTAR CUSTOMER SAYS: "PACQUET WAS ABLE TO MEET THE PROJECT'S REQUIREMENTS, BOTH TECHNICALLY AND IN TERMS OF MEETING DEADLINES. IT PROVIDED US WITH A CUSTOMIZED INTEGRATED SOLUTION".

Pacquet installed a  safe access folding stairs at the Nyrstar site in September 2018. Nyrstar wanted to secure tank dome access for calcine loading. 

  • VERIFICATION OF FEASIBILITY 
  • REVISION OF THE HEADLINE
  • CONSTRAINTS TO BE RESPECTED 
  • THE PNEUMATICALLY OPERATED FLAP GATE
  • INSTALLATION OF THE SYSTEM: 

 

​​​​Poste de chargement manchette vrac, Pacquet 2
  
​​​Poste de chargement manchette vrac, Pacquet